+7(495) 983-09-55

Licences


ZAO PRIZ has won the trust of Russian-based and global majors alike. ZAO PRIZ means 20 years of successful operations, high professionalism and impeccable reputation, commitment to innovation, on the one hand, and conservatism in matters of quality, on the other.


For activities involving the use of information classified as an official secret [Security Clearance].
Licence for activities involving the use of information classified as an official secret
Construction
Installation of process equipment
Hook-up and start-up
Management of construction, remodelling and refurbishment projects
Design engineering:
Permitted activities involving design documentation development

Development of design and space-planning solutions.

Development of specifications for utility systems, utility networks, list of engineering measures,
and descriptions of process design solutions.

Development of construction management plan.

Development of environmental protection measures.

Development of fire safety measures.

Development of materials on the safety of buildings and structures as part of the section "Other
documentation as provided for in federal laws".
Certificate: accreditation scope of metrological function of zao priz
ACCREDITATION SCOPE OF METROLOGICAL FUNCTION OF ZAO PRIZ

Metrological evaluation of calibration techniques proposed, testing programmes and procedures,
bases of design, terms of reference, technical and commercial tenders, project, design and other
documentation for SCADA, automated systems, measurement systems, and metering systems for
crude oil and petroleum product pipeline transportation, fuelling of road, rail and water vehicles,
etc.
Conformance certificate: Quality management system for design engineering
MANUFACTURE, INSTALLATION, HOOK-UP, START-UP, SHAKE-DOWN AND REPAIR OF
SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEMS, AND PRODUCTION PROCESS
AUTOMATION

THIS CERTIFICATE CERTIFIES THAT:

The quality management system for design engineering, manufacture, installation, hook-
up, start-up, shake-down and repair of supervisory control and data acquisition systems, and
production process automation complies with the GOST R ISO 9001-2008 national standard.

Certification scope of the quality management system

of PRIZ Closed Joint-Stock Company

-  PRIZ's quality management system covers the following activities: design engineering,
manufacture, installation, hook-up, start-up, shake-down and repair of supervisory
control and data acquisition systems, and production process automation.

-  Product life-cycle processes as per GOST P ISO 9001-2008 standard:

-  Planning of product life-cycle processes

-  Consumer-oriented processes

-  Design and development

-  Procurement

-  Manufacture net of consumer ownership

-  Control of monitoring and measuring devices

Matters pertaining to QMS certification can be covered in PRIZ consultations.
Certificate: Russian registry of shipping
PRIZ meets the requirements of the Russian Maritime Registry of Shipping as a provider
of:

Design engineering of electrical equipment and equipment of automatic and supervisory
control and data acquisition systems (SCADA);

Installation of electrical equipment and automatic and SCADA equipment;

Hook-up and start-up of electrical equipment and automatic and SCADA equipment.
Conformance certificate environmental management systems
Environmental Management System meets the requirements of GOST R ISO 14001-2007
(ISO 14001-2004) standard

Conformance certificate occupational health and safety management systems
The occupational health and safety management system meets the requirements of the
GOST 12.0.230-2007 and OHSAS 18001:2007 standards
Authorization certificate from Rockwell automation
ZAO Priz, Moscow, Russia
is an authorized systems integrator of Rockwell Automation and is authorized to provide the full
range of work and services related to customization and supply of solutions and systems based
on Allen-Bradley and Rockwell Software products, as well as the required after-sales service
and technical support in accordance with the Rockwell Automation corporate policy and the
legislation in place.
Licence to repair measuring instruments
It NoName and type of measurement
Measurement range
facility
Accuracy, %
1.
KIM-8 white-product weight-
measurement suite
Rated flow rate of
petroleum product loading: 90 mph
±0,5
2.
KIM-4 white-product weight-
measurement suite
Rated flow rate of
petroleum product loading: 60 mph
±0,25
3.
Orsk-3 white-product weight
measuring and computing
system
Range of petroleum
product mass flow rate in the measuring line: 13600-
136000 kgph
±0,25
4.
Yaroslavl-M measuring and
computing system
DC 4-20 mA;

frequency 5-1250
Hz;

resistance 39.23-
82.08 Ohms
±0,3